Willingham
art bus stop project: The Journey
Spring
2004
South Cambridgeshire District Council adopt a planning policy requiring
landowners to commission artists as part of the creation of new developments
Summer
2005
- David
Wilson Homes agree a contribution of £20,000 towards public art
as part of the Manor Farm development off Willingham High Street
- Willingham
Parish Council establish a public art steering group to manage the project
and invite input from local residents
Summer
2006
- Steering
group bring in local Arts Development Manager to advise on artist appointment
and identify two possible sites for the public art
Spring
2007
- Lead artist
is selected by steering group and overall project plan and timescales
determined
- Bus stop
site is chosen as an ideal opportunity to create a focal point whilst
considering the practical need for shelter
Summer
2007
- Steering
group develop plans for youth engagement project and community planting
scheme, and apply for funds to support from Awards for All and 02 in
the Community.
- Lead artist
presents concepts to steering group, which are approved for development.
Autumn
2007
- Parish
Council request a site survey to determine whether there is anything
underground that will affect/effect the structure/ design.
- The Highways
department offer advice on contractors and legal requirements.
- Discussions
take place between Parish Council and District Council to ensure planning
requirements are met.
- Lead artist
submits two potential design ideas to Willingham Parish Council for
consideration. One is selected and approved for further development.
Winter
2007-08
- Village
residents invited to meet artist and steering group and view design
ideas.
- Designs
also presented to SCDC Conservation Design Team for consideration.
- Co-designer
Louise Watson develops the detailed designs and has them checked by
a Structural Engineer to test loadings and foundation dimensions.
Spring
2008
- Detailed
designs agreed and manufacturing starts
- Youth
workshops on Connections Bus take place and selected designs forwarded
to lighting manufacturers Urbis for production.
- Fabrication
of canopy starts at Benson-Sedgwick Engineering workshop
- Limited
edition “Willingham Wing” shopping bags ordered along with
other promotional material
Summer
2008
- Fabricators
liaise with contractors to ensure installation
- Willingham
Wing is officially unveiled to the public
Images 1-8 Willingham Wing Installation
Images 9-14 initial concept sketches
Please click on images to enlarge
|